New house: weepholes 10 mm above the porch and courtyard paving

  • Building: Class 1a dwelling, single storey brick veneer on a waffle raft slab

  • Location: Western Melbourne

  • NCC edition: NCC 2022, Volume Two and Housing Provisions

  • Area of NCC requirements: H2P1, H2P2 and H2P3; Housing Provisions 5.7.4 and 5.7.5

  • Raised by: The relevant building surveyor, after the paving was laid

  • Year: 2026

The challenge

Coloured concrete paving was poured to the covered front porch and to a small enclosed courtyard of about 3.3 m². At the porch, the weepholes ended up 20 mm to 25 mm above the paving, and about 10 mm at one point, against the 50 mm required for covered paving. In the courtyard they were 50 mm to 75 mm above the paving, against 75 mm.

The performance solution

Expert judgement and comparison with the Deemed to Satisfy Provisions, backed by measurements and photos from site, showed the walls perform as well as walls with the full clearance:

  • The porch sits under the main roof and is enclosed on two sides, so very little rain reaches the base of the wall.

  • Measured on site, the porch paving falls about 23 mm over 1.2 m to a grated strip drain at the entry, and about 20 mm over 1 m away from the front wall. The courtyard falls about 45 mm over 750 mm, roughly 1 in 17, to a grated drain. Both drains connect to the stormwater system.

  • The impervious paving removes soil contact against the masonry. An expansion joint at the slab edge, plus a flexible sealant at the paving to wall junction, stops water tracking down beside the slab.

  • The weepholes are open perpends above a continuous flashing, so the cavity can still drain and ventilate. In brick veneer, any moisture in the outer leaf cannot bridge the cavity to the frame.

  • The under slab membrane continues around the edge rebate, so ground moisture is stopped independently of the damp proof course height.

  • The internal floor and entry threshold sit above the paving, so surface water cannot enter the house.

  • Ongoing conditions: keep the falls and drains working, never raise the paving with toppings or tiles, keep soil, mulch and planters off the walls, keep weepholes clear and keep the termite system compliant with AS 3660.1.

Outcome

Report prepared in November 2026 and successfully accepted by the relevant building surveyor.

Lesson for designers

For as built departures, measure and photograph the actual falls. Real figures, such as 23 mm over 1.2 m, carry an as built report much further than notes copied from the drawings.

Related: Performance solution report | Performance solutions Victoria

Need a performance solution for a similar problem? Request a fee proposal or phone 0407 560 708.