Performance Solution Case Studies
Real performance solutions from our own files, anonymised. Each case study shows the NCC clauses involved, the problem, how we solved it and what we learned. Every report is prepared by a registered building surveyor and assessed against the relevant Performance Requirements.
Have a similar problem? Request a fee proposal or phone 0407 560 708.
Below ground rumpus room: retaining wall as an external wall
An existing retaining wall became the external wall of a below ground rumpus room. Layered waterproofing and drainage met H2P1, H2P2 and H2P3 where freeboard and fall away could not.