Performance Solution Case Studies
Real performance solutions from our own files, anonymised. Each case study shows the NCC clauses involved, the problem, how we solved it and what we learned. Every report is prepared by a registered building surveyor and assessed against the relevant Performance Requirements.
Have a similar problem? Request a fee proposal or phone 0407 560 708.
Two unit development: fire separation, a floor below the driveway, and a garage above the living room
Two units on one lot had three departures: fire separation under 1.8 m, a floor below the driveway, and a garage slab 300 mm above a living room. One report resolved all three.