Performance Solution Case Studies
Real performance solutions from our own files, anonymised. Each case study shows the NCC clauses involved, the problem, how we solved it and what we learned. Every report is prepared by a registered building surveyor and assessed against the relevant Performance Requirements.
Have a similar problem? Request a fee proposal or phone 0407 560 708.
Indoor play centre: shared wash troughs and a 65 mm step at amenity doors
An indoor play centre was built with shared wash troughs outside the toilets and a 65 mm step at each amenity door. A performance solution covered F4P1, D1P1 and D1P2.