Building: Class 1a dwelling, renovation of an existing farmhouse with a new second storey containing three bathrooms
Location: Regional Victoria
NCC edition: NCC 2022, Volume Two and Housing Provisions
Area of NCC requirements: H4P1 wet areas; Housing Provisions 10.2.1 and 10.2.2 (AS 3740)
Raised by: The relevant building surveyor, at design stage
Year: 2026
The challenge
Each of the three new upstairs bathrooms has an 800 mm by 1200 mm aluminium window inside the shower area, with sills about 1200 mm above the floor. Shower walls must be waterproof to at least 1800 mm, so the window reveals, sills and frame junctions all sit inside the zone the Deemed to Satisfy Provisions require to be waterproof. Two of the windows are double hung, adding operable sashes as another path for water.
The performance solution
Expert judgement and comparison with the Deemed to Satisfy Provisions showed that the window openings can be detailed to perform as well as a solid waterproof wall:
Reveals, heads and sills are lined with a water resistant substrate recognised by AS 3740, such as cement sheet. Plasterboard is not used around these openings.
An AS 4654 membrane runs continuously across the sill, reveals and head, laps into the shower wall membrane and returns onto the window frame at a sealed bond breaker joint.
Tiled sills fall into the shower, away from the frame, and finish below the frame drainage line.
All junctions between the tiled reveals and the frame are sealed with a flexible, mould resistant, neutral cure sealant over a bond breaker.
Windows are installed to AS 2047 with head, jamb and sill flashings and sealing tape, and frame weep holes are kept clear so they drain to the outside.
Glazing is Grade A safety glass to AS 1288. The double hung sashes close against continuous weather seals, and the bushfire construction shown on the drawings is maintained.
The waterproofer provides an AS 3740 certificate that specifically covers the three window details, and the owner inspects the sealant joints at least once a year.
Outcome
Final report issued to the relevant building surveyor in November 2026 for approval with the building permit.
Lesson for designers
A window in a shower is a waterproofing detail first and a glazing detail second. Draw the reveal section early, show the membrane returning onto the frame, and name who will certify it.