Performance Solution Case Studies
Real performance solutions from our own files, anonymised. Each case study shows the NCC clauses involved, the problem, how we solved it and what we learned. Every report is prepared by a registered building surveyor and assessed against the relevant Performance Requirements.
Have a similar problem? Request a fee proposal or phone 0407 560 708.
Plunge pool with no Deemed to Satisfy drainage pathway
NCC Volume Two has no Deemed to Satisfy Provisions for pool drainage, so every new pool needs a performance solution under H2P4. Here is how one was resolved.