Demountable building: rear stair and door without access features (Queensland)

  • Building: Single storey demountable support building, Class 5 and 7b, to be reclassified Class 9b for education and training

  • Location: Townsville region, Queensland

  • NCC edition: NCC 2022, Volume One

  • Area of NCC requirements: D1P1 access for people with a disability; D4D2, D4D3, D4D4 and D4D9 with AS 1428.1

  • Raised by: The building certifier, in the decision notice

  • Year: 2026

The challenge

The building is about 108 m² and its front entrance is served by a compliant 1 in 14 ramp. At the rear, a sliding door opens onto a landing reached by a three riser stair with a total rise of 525 mm and open risers. The stair has balustrade rails but no AS 1428.1 handrails, tactile indicators, opaque risers or nosing contrast strips, and the rear door has no accessible threshold. The certifier required these features to be addressed.

The performance solution

Two performance solutions, assessed by expert judgement and comparison with the Deemed to Satisfy Provisions, showed that the rear stair and door are not part of the accessible path of travel and that D1P1 is met through the front entrance:

  • The front ramp is 7350 mm long with handrails to both sides, 1054 mm clear between handrails and an 1800 mm deep landing serving both entry doors. Tactile indicators at the top and bottom of the ramp were added as a condition.

  • Every room is reached internally from the front entrance, so no one needs the rear stair to reach any area normally used by occupants.

  • The rear stair serves one store room door, is used by staff only, and faces a boundary fence and swale away from the driveway and car park.

  • Under D4D3, at least 50% of pedestrian entrances, including the principal entrance, remain accessible.

  • The rear stair keeps its balustrade and rails, D3D14 compliant risers and goings, and open risers that will not pass a 125 mm sphere.

  • Directional signage with the International Symbol of Access is installed at the rear door, pointing to the accessible entrance.

  • A plan of management keeps the ramp available, provides staff assistance, directs students and visitors to the front entrance once the building is Class 9b, and keeps circulation clear.

  • The report assessed both the current Class 5 and 7b use and the future Class 9b use, since D4D2 requires the same extent of access for both.

Outcome

Final report issued to the building certifier in November 2026 for approval with the building development application.

Lesson for designers

When a building will be reclassified later, assess both uses in the same report. It avoids a second round of approvals when the use changes.

Related: Access performance solutions | Performance solutions Queensland

Need a performance solution for a similar problem? Request a fee proposal or phone 0407 560 708.

Previous
Previous

Gym in a former shop: a step at the only street entrance

Next
Next

Plunge pool with no Deemed to Satisfy drainage pathway