NCC Volume One Performance Solutions for Commercial and Multi Residential Buildings

Apartments, offices, shops, warehouses, childcare centres and other Class 2 to 9 buildings often reach a point where the Deemed to Satisfy provisions do not suit the design. DAV Building Solutions prepares Performance Solution Reports across NCC Volume One, written by a registered building surveyor for the surveyor or certifier who will assess them.

Reports and fee proposals are usually turned around within one business day.

Choose the Section your design departs from

Section C: Fire resistance

Type of construction and fire resistance levels, fire compartment sizes, separation of classifications, protection of openings in external walls, and external wall and cladding combustibility questions.

Section D: Access and egress

Travel distances, distance between alternative exits, exit widths, stair and ramp geometry, balustrades, door hardware and swing direction, and access for people with a disability under Part D4, including lifts, ramps, accessible toilets and secure areas with swipe access. See our Access Reports page.

Section E: Services and equipment

Fire hydrant and hose reel coverage, fire extinguisher locations, smoke hazard management, emergency lighting and exit sign layouts.

Section F: Health and amenity

External waterproofing and surface water, wet areas in commercial and Class 2 buildings, roof and wall cladding weatherproofing, sanitary facility numbers and layouts, room heights, light and ventilation, sound insulation, and condensation management. See our weatherproofing and waterproofing service.

We also prepare solutions under Sections G, H, I and J where a project needs them. Ask us at the fee proposal stage.

Recent Volume One projects

Working on a house, extension or pool? See NCC Volume Two Performance Solutions.

Why use a registered building surveyor for your Performance Solution

  • Registered in Victoria, New South Wales, Queensland and South Australia, and AIBS accredited for Tasmania

  • ACAA member (Member 797) for access solutions

  • Graduate Certificate in Performance Based Building and Fire Codes

Frequently asked questions

Do I need a fire safety engineer?

Many egress, access and amenity solutions do not. Solutions that rely on fire or smoke modelling usually do, and we tell you at the brief stage.

Who has to agree to the Performance Based Design Brief?

Usually the owner, designer, building surveyor or certifier, and the fire authority where the state requires it.

Can one report cover several departures?

Yes. Related departures are usually assessed together in one report, which keeps the cost and the assessment simpler.

Request a Fee Proposal: upload your drawings for a fixed fee quote.