Weatherproofing and Waterproofing Performance Solutions
Water problems are among the most common reasons a design cannot follow the Deemed to Satisfy provisions. Architects want flush thresholds, polished concrete bathrooms and cladding systems the Housing Provisions never anticipated. DAV Building Solutions prepares Performance Solution Reports that show your building surveyor or certifier how the design still keeps water out and protects the structure.
Reports and fee proposals are usually turned around within one business day.
What we cover
Weatherproofing (Volume Two Part H2, Volume One Part F3)
Wall cladding systems outside the Housing Provisions, including lightweight cladding on Class 9b buildings such as childcare centres
Flush and level thresholds, and pedestal pavers at external sliding doors
Reduced floor to ground clearances, low weepholes and slab edge exposure
Low pitch roofs, non standard rooflights, missing eaves gutters, and box or valley gutters on constrained roofs
External waterproofing and surface water (Volume One Part F1, Volume Two Part H2)
Balconies, podiums and roof terraces over habitable rooms
Below ground and retaining walls to habitable spaces
Pool drainage and overflow paths where no Deemed to Satisfy route exists
Wet areas (Volume Two Part H4 and Housing Provisions Part 10.2, Volume One Part F2)
Polished concrete and microcement floors and walls
Timber or vinyl floors in laundries and powder rooms without tiles
Hobless and step free showers, linear drains without full falls, and windows inside showers
Waterproofing systems used outside AS 3740
How we assess it
Each report states which Performance Requirement applies, the assessment method used (expert judgement, comparison with the Deemed to Satisfy provisions, or a Verification Method), and the evidence relied on: manufacturer testing, CodeMark or other certification, and the detailing on your drawings. Where the solution depends on how it is built, the report lists the inspection points your surveyor will need.
Recent weatherproofing and waterproofing projects
New house: weepholes 10 mm above the porch and courtyard paving (Part H2). Falls, drains and sealing to manage water near low weepholes.
First floor addition with no eaves gutters (Part H2, roof drainage). Upper roof water sheds onto the guttered roof below.
Tilt up concrete panel walls: no Deemed to Satisfy pathway for weatherproofing (Part F3). Cracking, joints and permeability controlled to meet F3P1.
Farmhouse renovation: three windows inside the showers (Part H4, wet areas). Window reveals detailed below the 1800 mm waterproofing height.
Engineered timber floor in a powder room (Queensland) (Part H4, wet areas). Timber in place of tiles, with the substrate kept and junctions sealed.
See also our NCC Volume Two Performance Solutions for houses and our NCC Volume One Performance Solutions for commercial buildings.
Frequently asked questions
Can I have a flush threshold at my back door?
Often yes, with a Performance Solution supported by drainage and membrane detailing at the door. We review the drawings and tell you what the report will need.
Is a polished concrete bathroom compliant?
Not under the Deemed to Satisfy provisions as a rule, but it can be justified as a Performance Solution with the right sealer, falls and junction details.
Do you need product test reports?
Usually. Send the manufacturer's data sheets and any test reports with your enquiry and we will confirm what else is needed.
Request a Fee Proposal: upload your drawings and product data sheets.