NCC Volume Two Performance Solutions for Houses and Class 10 Structures
When a house, extension, garage, deck or pool cannot follow the Deemed to Satisfy provisions, a Performance Solution shows how the design still meets the NCC Performance Requirements. DAV Building Solutions prepares Performance Solution Reports for Class 1 and 10 buildings across every Part of NCC Volume Two. Reports are written by a registered building surveyor, so they are prepared the way your building surveyor or certifier needs to assess them.
Reports and fee proposals are usually turned around within one business day.
Choose the Part your design departs from
Part H1: Structure
Alternative footing and slab designs, non standard bracing, portable and relocatable structures, and products used outside the scope of their referenced standard.
Part H2: Damp and weatherproofing
Reduced floor to ground clearances, flush or level thresholds at external doors, cladding and roofing systems outside the Housing Provisions, low roof pitches, pool drainage, and box or valley gutters on constrained roofs. See our weatherproofing and waterproofing service.
Part H3: Fire safety
External walls and openings close to a boundary or another building, eaves and gutters within the fire separation distance, and fire separation between attached Class 10 structures and the house.
Part H4: Health and amenity
Wet area waterproofing alternatives (polished concrete, timber floors in laundries, linear drains without falls), reduced ceiling heights, natural light and ventilation shortfalls, and condensation management.
Part H5: Safe movement and access
Stair geometry outside the riser and going limits, winders, balustrade heights and openings, and landings at doors.
Part H6: Energy efficiency
Building fabric, glazing and sealing departures where a Deemed to Satisfy or NatHERS pathway does not fit the design.
Part H7: Ancillary provisions
Fireplaces, chimneys and flues, swimming pool and spa provisions, and construction in bushfire prone and alpine areas.
Part H8: Livable housing design
Step free entry alternatives on sloping sites, door and corridor widths, and toilet and shower layouts that cannot meet the Livable Housing Design Standard as drawn.
Recent Volume Two projects
Two unit development: fire separation, a floor below the driveway, and a garage above the living room (Part H3 and more). Three departures resolved in one report.
Below ground rumpus room: retaining wall as an external wall (Part H2). Layered waterproofing and drainage where freeboard and fall away could not be achieved.
Plunge pool with no Deemed to Satisfy drainage pathway (Part H2, pool drainage). A solution where Volume Two offers no Deemed to Satisfy route at all.
Livable housing: no step free path to a detached pool house (Part H8). Showed the step free path applies to the dwelling, not the pool house.
Working on a commercial or apartment project? See NCC Volume One Performance Solutions.
Why use a registered building surveyor for your Performance Solution
Registered in Victoria, New South Wales, Queensland and South Australia, and AIBS accredited for Tasmania
Graduate Certificate in Performance Based Building and Fire Codes
Reports structured around the assessment method your surveyor must sign off
Frequently asked questions
Does my building surveyor have to accept a Performance Solution?
No report is accepted automatically. Your building surveyor or certifier assesses it against the Performance Requirements, which is why we write it for that assessment from the start.
How long does a Volume Two report take?
Usually within one business day, once we have the drawings and information we need.
Which NCC edition applies to my project?
The edition adopted in your state on the date your permit application is lodged. We confirm this at the brief stage.
Request a Fee Proposal: upload your drawings for a fixed fee quote.